Time & Work — Think in '1-Day Work'
The unitary trick: turn 'days' into 'work per day', add them up, and Time & Work becomes easy.
Reviewed by Kaustav Basak (19 years teaching)Written with AI helpReport a mistake
6 min read · Published 26 June 2026
Part of SSC CGL prepEating a pizza
If you finish a pizza in 4 days, you eat ¼ of it each day. Work is the same: if A finishes a job in 10 days, A does 1/10 of it per day. This '1-day work' idea unlocks everything.
The core idea
When people work together, just ADD their 1-day works. If A does 1/6 per day and B does 1/12 per day, together they do 1/6 + 1/12 = 1/4 per day — so they finish in 4 days.
A finishes in 6 days, B in 12 days. Together?
A's 1-day work = 1/6
B's 1-day work = 1/12
Together = 1/6 + 1/12 = 3/12 = 1/4 per day
Time together = 4 days
Quick check
A is twice as efficient as B. If B alone takes 12 days, how long does A take?
Keep studying
7 min read
Profit & Loss — The Complete Basics
6 min read
Percentages — Master the Per-Hundred
5 min read
Averages — Sum ÷ Count, Made Simple
5 min read
Ratio & Proportion — Compare and Scale